Site, machine, permissions, power and the numbers — decide whether a charging station in India will pay you back before you spend a rupee
A 43-page India playbook built on the documents that actually govern this business: the Ministry of Power's 2024 charging guidelines, PM E-DRIVE's operational guidelines, CEA safety regulations 123 to 128, the GST advance ruling on charging, and five notified state EV policies. It opens with the number nobody quotes — the median public DC charger in India is busy 8.7 per cent of the day — and then shows you how to find a site that clears 18 per cent, what the hardware really costs in 2026, what the permissions actually are, and what the payback looks like at every utilisation level.
Get Your Copy →Four kinds of reader, one decision to get right
You already have the frontage, the footfall and the power. Part Two shows you the host model, the revenue-share structure the government itself uses, and the five clauses that stop a bad site becoming a stranded asset.
Part Three to Five cost three real station archetypes line by line, from a ₹5 lakh e-rickshaw stand to a ₹38 lakh highway hub, and show what each one pays back at 8, 18 and 25 per cent utilisation.
You are being sold a charger. Chapter 28 shows why a destination site rarely works as an owned asset at 12 per cent, and what to ask for instead so the capital sits on somebody else's balance sheet.
You have the vehicles and the yard. The fleet-contractor route, the offtake contract terms, the 30 to 80 kW swap-station option and the tariff treatment are all worked through with the numbers.
Six things the free content online does not give you
An SBI report puts most Indian stations at 1–3 per cent utilisation, S&P at 5 per cent, and a November 2026 tracking of 1,745 public DC stations at a median of 8.7 per cent. The book is built around that, not around the growth headline.
Listed prices from Indian manufacturers — a 60 kW dual-gun CCS2 charger from ₹5.69 lakh to ₹12.98 lakh, a 120 kW from ₹8.1 lakh to ₹17.93 lakh — plus the BEE benchmark costs that decide subsidy calculations.
DISCOM timelines of 3, 7, 15 and 30 days and the 90-day case, the 150 kW low-tension line, CEIG safety clearance, fire NOC, the national database — and what to do when a step stalls.
Single-part tariff capped at average cost of supply, 0.7 times in the 9 am to 4 pm window and 1.3 times outside it, the service charge ceilings, and the 18 per cent GST ruling that catches people out.
PM E-DRIVE's four location categories and the sentence that excludes private owners, plus the notified terms in Madhya Pradesh, Maharashtra, Tamil Nadu, Uttar Pradesh and Karnataka — with the five questions to ask your nodal agency.
A capex estimator, a payback calculator, a vendor comparison sheet, an approvals checklist and a 90-day launch plan. Print them, fill them in, and you have a decision.
Seven parts, fifty chapters, 27 tables — no filler
What you are actually selling, where India's electric fleet really is, the 52,718 chargers and the utilisation problem, four business models, and ten beliefs that cost people money.
The four site types that clear viability, how to count demand in three visits without a survey company, a 100-point site scorecard, and the land and host conversation.
The connector alphabet, matching the charger to the fleet at your gate, real 2026 prices, nine questions for the vendor, upstream electrical work, and the software that decides your revenue.
De-licensed but regulated, the DISCOM process step by step, your tariff and solar hours, service charge ceilings, CEIG and CEA Chapter XI, and how to read your first electricity bill.
Three station archetypes costed line by line, the revenue equation, utilisation scenarios from 5 to 25 per cent, three sites and three outcomes, operating costs, GST, financing, subsidies, the 2028 sunset and the cash-flow trap.
Pricing inside a ceiling, uptime as a revenue line, winning fleets first, the pitch and contract terms, battery swapping, solar and the 9-to-4 window, staffing, the compliance file, and scaling to site two.
Five printable worksheets, a 90-day launch plan, twenty questions people actually ask, a glossary and the full source list with dates.
Plain terms, because a capital decision deserves them
One-time payment · Instant download · Lifetime access
Three things we will not do
Every figure carries a source and a date. Where a number comes from industry tracking rather than a government document, the book says so on the page.
This book will tell you when a site does not work. Chapter 27 shows a station paying back in fourteen years and explains why that is the median outcome, not the worst case.
UPI, cards, net banking and wallets — processed on PCI-DSS compliant infrastructure, with instant delivery to the download page.
Everything worth knowing before you buy
Yes — that is exactly who it is written for. The first five chapters are meant to be read before you spend anything: they tell you what the business actually is, where India's electric fleet really sits, and what the median charger in the country earns. Part Two then gives you a way to test a specific site in three visits.
Everything was checked in the first week of November 2026. That includes the Ministry of Power guidelines of September 2024, PM E-DRIVE's operational guidelines of September 2025, CEA regulations of 2023, the battery swapping guidelines of January 2025, Vahan registration data through October 2026, the Unified Bharat e-Charge launch of August 2026, and the state EV policies notified between 2022 and 2025.
No, and you should distrust anything that does. It gives you the arithmetic — units sold, margin per unit, fixed costs — and runs it at four utilisation levels so you can see how violently the answer moves. You then put your own site's traffic count and your own vendor quotes into the worksheets.
It covers both. PM E-DRIVE's Rs 2,000 crore for public charging is open only to government and public sector entities, and the book says so plainly rather than implying otherwise. The state table covers the notified terms in Madhya Pradesh, Maharashtra, Tamil Nadu, Uttar Pradesh and Karnataka, and gives you the five questions to ask your own state nodal agency.
Yes. Part Two covers the host model and the destination site in detail, and Chapter 28 works through why a mall or society installation usually should not be an owned asset — and what to negotiate instead.
No. It lists what Indian sellers were charging in November 2026 so you know the range, and gives you nine questions to ask any vendor, including the type test certificate, the OCPP version and the response time. There is no dealer relationship behind this book.
After a successful payment on Razorpay you are redirected to a thank-you page with a download button. Click it and the PDF is yours — no app, no login, no expiry.
Digital products are non-refundable because they are instantly downloadable. If you receive a defective file or were charged incorrectly, email us within 7 days and we will resolve it.
Email lonefaisal977@gmail.com or message us on WhatsApp at +91 96826 00301. We usually reply within 24 hours.
Readers of this playbook usually pair it with one of these
For the 9 am to 4 pm window: sizing an array to your daytime charging load, net metering, and the subsidy paperwork.
The entity, GST registration, current account and annual filings a new charging business needs in its first year.
Invoicing, input credit and returns — the practical companion to Chapter 30 on the 18 per cent charging service.
43 pages · 50 chapters · 27 tables · 5 worksheets — start reading in 60 seconds.
Get Your Copy →